Job card and job costing fields

The Job card on a signed quote (actual costs, photos, public profile tick), crew and time changes, and the Field work job-costing settings.

Contractor Hub → Jobs (signed work and job costing) → open a job, or open a signed quote. The Job card appears on the quote after it is signed. Crew and time changes are in Field work. Cost settings are in Field work → Settings (owner only).

A job is a signed quote. You record what you really spent so VisionScaper can compare it with the estimate and show actual gross profit. The job status itself is changed with the status-line button at the top, not on this card.

Before you start

  • Your labor rate and overhead % come from Settings → Costs and markups (placeholders until you set them).

Fields

Job card (signed quote)

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Materials $ (actuals.material) Actual material spend so far. The card shows the estimate beside it. Total dollars, e.g. 1450. 0
Crew hours (actuals.labor_hours) Actual labor hours; multiplied by your labor rate for cost. Hours, e.g. 32. 0
Equipment $ (actuals.equipment) Actual equipment cost. Dollars. 0
Subcontractors $ (actuals.sub) Actual subcontractor cost. Dollars. 0
Disposal & delivery $ (actuals.disposal) Actual dump and delivery cost. Dollars. 0
Other $ (actuals.other) Anything else. No estimate is shown for it. Dollars. 0
Actual cost totals (read-only) Estimated cost, Actual cost so far (includes your overhead %), Variance (red when over), Actual gross profit with percent (red under 25%), Hours est / actual. Nothing to enter.
Finished photos / Add photo (job.photos) Pictures of the finished job; the x button removes one. Add after pictures.
Show this job (design + finished photo) on my public profile (job.showcase) Includes the job in your public contractor profile showcase. Tick only if the customer is fine with it. Off
Save job Saves actuals, photos and the showcase tick.
Ask for a review Starts a review request for this customer.
Schedule a visit Opens the visit form.

Field work: Crew & time on a job

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Crew chips (Save crew) (emps) Choose who works this visit; they are told when you press Save crew. Tap names to toggle.
Change the time: Start / End (start, end) Moves the job. Pick new start and end. Current times
Tell the customer (Change the time) (notify) Also notifies the customer of the move. Assigned employees are always told. Off
Move job Saves the new time.

Field work > Settings > Jobs and Job costing (owner only)

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
A job is “late” after (minutes) (overdue_minutes) How long after its start time an unstarted job counts as late. Minutes. 30
Crew-finished jobs wait for a manager’s approval (require_approval) Finished jobs need approval. Off
A “before” photo is required to finish a job (require_before) Crew cannot finish without a before photo. Off
An “after” photo is required to finish a job (require_after) Same for after. Off
Count materials (materials_basis) Whether job cost counts materials used or bought. Pick one. Choices: Used on the job; Bought for the job. Used on the job
Show an overhead allocation (include_overhead) Adds your overhead % as a line in job cost. Off
Warn when labor passes the estimate by (%) (over_budget_pct) Alert threshold for hours over estimate. Percent. 10
Your own cost per hour ($) (owner cost_rate) Cost rate for hours you work. Blank uses the company labor rate. e.g. 45.00. Blank
Save settings Saves the Field work settings (also the time, alerts and activity settings on that screen).

Steps

  1. Open the signed job and scroll to the Job card.
  2. Under Job costing – actual costs type each actual as you learn it.
  3. Watch the Variance and Actual gross profit.
  4. Add Finished photos; tick the showcase box if allowed.
  5. Press Save job.
  6. To reassign crew or move the time, use Field work → job → Crew & time.
  7. Owners: set the late rule, photo rules and over-budget % in Field work → Settings and press Save settings.

If something goes wrong

  • If Save job fails with a message, it was refused by the website; nothing is saved.
  • The status on the card cannot be edited. Use the button on the status line at the top.