Set your supplier costs and production rates for the items the automatic estimate uses, or reset to defaults.
On this page
Path: Settings → Prices and quotes → Price book. Your supplier prices and production rates. Every number feeds the automatic estimate (takeoff).
Warning: Starting numbers are placeholders, not approved. Replace them with your real costs.
What is in it
Each item is a collapsible row. Items include: Mulch, Decorative stone, New bed (turf removal & soil prep), Edging, Sod, Seed, Pavers, Gravel path, Retaining wall, Plants, Removals, Boulders, Landscape lighting, Fence, Grading, Delivery and Final cleanup. (Your version may show a slightly different list.)
Inside an item you will see boxes such as:
- Cost per unit ($)
- Waste / overage (%)
- Hours per unit
- Prep hours per 100 sq ft
- Cost per sq ft ($)
- Hours per sq ft
- Cost per block ($) and Cost per cap ($)
- Hours per face sq ft
- Fixture cost ($) and Transformer cost ($)
Some items hold pairs, like “steel: 3.25, 0.06”, which mean cost per foot then hours per foot.
Steps
- Open Price book.
- Click an item to expand it.
- Type your supplier price and the hours your crew needs per unit.
- Repeat for the items you sell.
- Click Save price book.
To go back, click Reset to defaults and confirm “Reset the whole price book to VisionScaper defaults?”.
Tips
- Only items you change are stored as your own. The rest follow the defaults.
- Update prices when your supplier updates theirs.
- Time one real job to learn real hours per unit.
- Search for “mulch”, “pavers” or “sod” to jump here.
If something goes wrong
- A number reverts. Click Save price book after editing.
- Estimates look odd. Check Waste / overage and the hours.