Settings → Price book: pavers, gravel path, retaining wall, boulders, fence

Help Center › Admin screens, field by field › Settings → Price book: pavers, gravel path, retaining wall, boulders, fence

Settings → Price book: pavers, gravel path, retaining wall, boulders, fence

Every price-book number for pavers, gravel path, retaining walls, boulders and fences, with what each does.

This is the second part of Settings → Prices and quotes → Price book. It covers the sections for hard surfaces and structures: Pavers, Gravel path, Retaining wall, Boulders and Fence. The way the screen works is explained in the first price book article.

Warning: Every figure here is a placeholder, not approved. Replace each with your own supplier cost and your own crew production before you quote.

Before you start

  • Supplier prices for pavers or stone, base gravel, sand, edge restraint, joint sand, wall block and caps, drain pipe, fabric, geogrid and fence by the foot.
  • Your crew’s real production: square feet laid per day and hours per unit.
  • Rental prices for the compactor, wet saw and machines you use.

Fields

Pavers

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Cost per sq ft ($) book.pavers.sfCost Your cost per square foot of paver or stone material. A decimal number. Default 4.6 (placeholder, not approved)
Waste / overage (%) book.pavers.waste Extra material for cuts, in percent, on straight work. A decimal number. Default 8 (placeholder, not approved)
Curve Waste book.pavers.curveWaste Extra material in percent when the patio or walk has curves. A decimal number. Default 12 (placeholder, not approved)
Base In book.pavers.baseIn Inches of compacted gravel base. A decimal number. Default 6 (placeholder, not approved)
Bedding In book.pavers.beddingIn Inches of bedding sand. A decimal number. Default 1 (placeholder, not approved)
Paver In book.pavers.paverIn Paver thickness in inches. Added to base and bedding depth to work out how deep to dig. A decimal number. Default 2.375 (placeholder, not approved)
Gravel Ton Cost book.pavers.gravelTonCost Your cost per ton of processed gravel base. A decimal number. Default 32 (placeholder, not approved)
Sand Ton Cost book.pavers.sandTonCost Your cost per ton of bedding sand. A decimal number. Default 38 (placeholder, not approved)
Tons Per Cy book.pavers.tonsPerCy Tons per cubic yard of base and sand; turns volume into tons. A decimal number. Default 1.4 (placeholder, not approved)
Compact book.pavers.compact Multiplier for gravel base that compacts (1.15 means 15 percent extra). A decimal number. Default 1.15 (placeholder, not approved)
Restraint Lf book.pavers.restraintLf Your cost per linear foot of edge restraint with spikes. A decimal number. Default 1.6 (placeholder, not approved)
Poly Bag Cost book.pavers.polyBagCost Your cost per bag of polymeric joint sand. A decimal number. Default 36 (placeholder, not approved)
Sf Per Bag book.pavers.sfPerBag Square feet one bag of joint sand covers. A decimal number. Default 75 (placeholder, not approved)
Hours per sq ft book.pavers.hrsPerSf Labor hours per square foot to base, screed, lay and cut pavers. A decimal number. Default 0.12 (placeholder, not approved)
Excav Hrs Per Cy book.pavers.excavHrsPerCy Excavation labor hours per cubic yard dug. A decimal number. Default 0.6 (placeholder, not approved)
Disposal Per Cy book.pavers.disposalPerCy Your disposal cost per cubic yard of excavated soil. A decimal number. Default 45 (placeholder, not approved)
Compactor Day book.pavers.compactorDay Plate compactor rental for one day. A decimal number. Default 95 (placeholder, not approved)
Saw Day book.pavers.sawDay Wet saw rental for one day. A decimal number. Default 90 (placeholder, not approved)
Machine Day book.pavers.machineDay Skid steer or mini excavator price for one day. A decimal number. Default 350 (placeholder, not approved)
Machine Min Sf book.pavers.machineMinSf Smallest area in square feet at which a machine day is added. A decimal number. Default 250 (placeholder, not approved)
Sf Per Day book.pavers.sfPerDay Square feet your crew lays in a day; sets the number of days for equipment. A decimal number. Default 300 (placeholder, not approved)
Step Cost book.pavers.stepCost Your cost for one step (block or stone tread). A decimal number. Default 260 (placeholder, not approved)
Step Hrs book.pavers.stepHrs Labor hours to build one step. A decimal number. Default 4 (placeholder, not approved)

Gravel path

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Base In book.gravelpath.baseIn Inches of gravel base for a gravel path. A decimal number. Default 4 (placeholder, not approved)
Stone In book.gravelpath.stoneIn Inches of surface stone on the path. A decimal number. Default 2 (placeholder, not approved)
Hours per sq ft book.gravelpath.hrsPerSf Labor hours per square foot of path. A decimal number. Default 0.05 (placeholder, not approved)

Retaining wall

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Block Sf book.wall.blockSf Face area in square feet that one wall block covers. A decimal number. Default 0.667 (placeholder, not approved)
Cost per block ($) book.wall.blockCost Your cost per wall block. A decimal number. Default 4.4 (placeholder, not approved)
Cap Per Lf book.wall.capPerLf Caps needed per linear foot of wall. A decimal number. Default 0.75 (placeholder, not approved)
Cost per cap ($) book.wall.capCost Your cost per wall cap. A decimal number. Default 6.8 (placeholder, not approved)
Waste / overage (%) book.wall.waste Extra blocks and caps for waste, in percent. A decimal number. Default 5 (placeholder, not approved)
Base Gravel Cy Per Lf book.wall.baseGravelCyPerLf Cubic yards of base gravel per linear foot of wall. A decimal number. Default 0.037 (placeholder, not approved)
Backfill Cy Per Face Sf book.wall.backfillCyPerFaceSf Cubic yards of drainage stone backfill per square foot of wall face. A decimal number. Default 0.037 (placeholder, not approved)
Gravel Ton Cost book.wall.gravelTonCost Your cost per ton of gravel (base and backfill). A decimal number. Default 32 (placeholder, not approved)
Drain Lf book.wall.drainLf Your cost per linear foot of perforated drain pipe. A decimal number. Default 1.25 (placeholder, not approved)
Fabric Lf book.wall.fabricLf Your cost per linear foot of filter fabric. A decimal number. Default 0.9 (placeholder, not approved)
Hours per face sq ft book.wall.hrsPerFaceSf Labor hours per square foot of wall face. A decimal number. Default 0.25 (placeholder, not approved)
Excav Hrs Per Lf book.wall.excavHrsPerLf Excavation hours per linear foot of wall. A decimal number. Default 0.15 (placeholder, not approved)
Geogrid Lf book.wall.geogridLf Your cost per linear foot of geogrid (added for walls taller than 3 ft). A decimal number. Default 2.4 (placeholder, not approved)
Machine Day book.wall.machineDay Mini excavator price for one day. A decimal number. Default 350 (placeholder, not approved)
Machine Min Lf book.wall.machineMinLf Smallest wall length in feet at which an excavator is added. A decimal number. Default 25 (placeholder, not approved)

Boulders

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Cost per unit ($) book.boulder.cost Your cost for one boulder. A decimal number. Default 140 (placeholder, not approved)
Hrs book.boulder.hrs Labor hours to set one boulder. A decimal number. Default 0.75 (placeholder, not approved)
Machine Day book.boulder.machineDay Skid steer price for one day, added when three or more boulders are set. A decimal number. Default 350 (placeholder, not approved)

Fence

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Vinyl book.fence.vinyl Vinyl fence: first number is your cost per linear foot, second is install hours per linear foot. Two numbers separated by a comma. Default 24, 0.35
Wood book.fence.wood Wood fence: cost per linear foot, then hours per linear foot. Two numbers separated by a comma. Default 19, 0.35
Aluminum book.fence.aluminum Aluminum fence: cost per linear foot, then hours per linear foot. Two numbers separated by a comma. Default 32, 0.35
Splitrail book.fence.splitrail Split-rail fence: cost per linear foot, then hours per linear foot. Two numbers separated by a comma. Default 9, 0.2
Chainlink book.fence.chainlink Chain-link fence: cost per linear foot, then hours per linear foot. Two numbers separated by a comma. Default 14, 0.25

Buttons

Field (exact label) What it does for VisionScaper What to enter and example Default / notes
Save price book (button) Stores your edited numbers, for this and every other section. Press once after editing. Message “Saved.”
Reset to defaults (button) Clears all your overrides everywhere in the price book. Press, then OK to confirm. Cannot be undone.

Steps

  1. Open Settings → Prices and quotes → Price book.
  2. Click Pavers. Enter your material cost per square foot and waste percents, then the base, sand and paver depths you build to.
  3. Enter your gravel, sand, restraint and joint sand costs, then the labor hours and your daily rental prices.
  4. Open Gravel path, Retaining wall, Boulders and Fence and fill them the same way. For each fence type type two numbers with a comma (cost per foot, hours per foot).
  5. Press Save price book.
  6. Price a sample patio or wall in the Landscape plan tool and check that the totals look right.

Tips

  • Hours-per-unit boxes matter as much as costs. Time a real job once.
  • Leave a section you never sell untouched; it will not be used unless a plan includes that item.
  • A wall taller than 3 ft automatically adds geogrid, so the geogrid cost matters for tall walls.

If something goes wrong

  • A value reverted to 0. An empty or non-number box is saved as 0.
  • A fence price looks wrong. Both numbers must be separated by a comma: cost first, hours second.
  • Totals did not change. Quotes already saved keep their old numbers; open or re-price the plan.